Since 2018

Reference projects

A selection of contracts since 2018. Filter by type or year.

Type:
Year:
Demolition – Läkarhuset Odenplan, Odenplan, Stockholm Demolition
Year
2026
Area
9 000 m²
Location
Odenplan, Stockholm

Läkarhuset Odenplan

Demolition of a 16-storey office building in central Stockholm. To be carried out in autumn 2026.

Demolition – Eriksbergsskolan, Helenelund, Sollentuna DemolitionRemediationGroundwork & excavation
Year
2026
Area
2 800 m²
Location
Helenelund, Sollentuna

Eriksbergsskolan

Demolition of a school building with asbestos and PCB remediation. Basement and shelter retained. Ongoing.

Client: Sollentuna kommun

Demolition – Årstavägen 112, Årsta, Stockholm DemolitionGroundwork & excavation
Year
2025
Area
10 000 m²
Location
Årsta, Stockholm

Årstavägen 112

Demolition of a care and nursing home in two four-storey blocks within a residential area. Carried out October 2025–February 2026.

Demolition – Bagartorps Centrum, Bagartorpsringen, Solna Demolition
Year
2025
Area
1 700 m²
Location
Bagartorpsringen, Solna

Bagartorps Centrum

Demolition of retail buildings.

Client: Bostadsstiftelsen Signalisten

Bridge works – Torsviksbroarna, Torsvik, Lidingö Bridge worksDemolitionGroundwork & excavation
Year
2025
Area
1 500 m²
Location
Torsvik, Lidingö

Torsviksbroarna

Demolition and excavation of bridge decks.

Demolition – Förskolan Myran, Vårby Demolition
Year
2025
Area
800 m²
Location
Vårby

Förskolan Myran

Demolition of a preschool.

Demolition – Edeby Säteri, Hölö Demolition
Year
2025
Area
700 m²
Location
Hölö

Edeby Säteri

Demolition of a fire-damaged building.

Demolition – Tumba, Tumba Demolition
Year
2024
Area
800 m²
Location
Tumba

Tumba

Demolition of a car workshop and offices.

Bridge works – Höglandsvägen, Södertälje Bridge worksDemolitionGroundwork & excavation
Year
2024
Area
670 m²
Location
Södertälje

Höglandsvägen

Removal of surfacing and reinstatement of a pedestrian and cycle bridge.

Demolition – Circle K, Örebro DemolitionRemediation
Year
2024
Area
400 m²
Location
Örebro

Circle K

Demolition of a petrol station.

Demolition – Norra Kungsgatan, Flen DemolitionRemediation
Year
2024
Area
390 m²
Location
Flen

Norra Kungsgatan

Demolition of a petrol station and land remediation.

Client: Flens kommun

Dismantling – Samskolan, Saltsjöbaden, Nacka Dismantling
Year
2023
Location
Saltsjöbaden, Nacka

Samskolan

Dismantling of a pellet heating plant, including the boiler, silo and ancillary equipment.

Demolition – Hangar 83, Västerås Demolition
Year
2023
Area
5 000 m²
Location
Västerås

Hangar 83

Demolition of an aircraft hangar.

Demolition – Vigelsjöskolan, Norrtälje Demolition
Year
2023
Area
1 600 m²
Location
Norrtälje

Vigelsjöskolan

Demolition of a school building.

Demolition – Sälen, Sälen Demolition
Year
2023
Area
1 600 m²
Location
Sälen

Sälen

Demolition of a ski lift system.

Demolition – Shell, Johanneshov, Stockholm DemolitionRemediation
Year
2023
Area
1 400 m²
Location
Stockholm

Shell, Johanneshov

Demolition of a petrol station.

Bridge works – Västerbron, Stockholm Bridge worksDemolition
Year
2022
Area
3 600 m²
Location
Stockholm

Västerbron

Removal of surfacing on footway, cycleway and carriageway.

Demolition – Sollentuna kommun, sju lador, Sollentuna Demolition
Year
2022
Area
3 000 m²
Location
Sollentuna

Sollentuna kommun, sju lador

Demolition of seven barns at various addresses.

Client: Sollentuna kommun

Demolition – Ljungbyplan, Spånga Demolition
Year
2022
Area
2 000 m²
Location
Spånga

Ljungbyplan

Demolition of a multi-storey car park.

Demolition – Circle K, Älta, Älta DemolitionRemediation
Year
2022
Area
1 500 m²
Location
Älta

Circle K, Älta

Demolition of a petrol station with retail building.

Dismantling – Hasselgatan, Upplands Väsby DismantlingDemolition
Year
2021
Location
Upplands Väsby

Hasselgatan

Dismantling and removal of 42 residential modules. Turnkey contract.

Client: Aktiebolaget Väsbyhem

Demolition – Bromma Blocks, Hangar 5, Bromma Demolition
Year
2021
Area
9 000 m²
Location
Bromma

Bromma Blocks, Hangar 5

Removal of waterproofing in an office building.

Demolition – Nytorget, Nyköping Demolition
Year
2021
Area
3 600 m²
Location
Nyköping

Nytorget

Demolition of a steel-clad hall.

Demolition – Materialvägen, Nyköping Demolition
Year
2021
Area
3 500 m²
Location
Nyköping

Materialvägen

Demolition of a fire-destroyed industrial hall.

Demolition – Telegrafen, Nynäshamn Demolition
Year
2021
Area
2 000 m²
Location
Nynäshamn

Telegrafen

Demolition of a property.

Demolition – Kv. Nattugglan, Folkungagatan, Stockholm Demolition
Year
2020
Area
11 000 m²
Location
Folkungagatan, Stockholm

Kv. Nattugglan

Demolition of an office building.

Dismantling – Frigg, Sicklaön, Nacka DismantlingDemolition
Year
2020
Area
7 000 m²
Location
Sicklaön, Nacka

Frigg

Dismantling and removal of 254 residential modules. Turnkey contract.

Client: Stockholms Studentbostäder

Demolition – Ekesiöö Byggvaruhandel, Bromma Demolition
Year
2020
Area
4 000 m²
Location
Bromma

Ekesiöö Byggvaruhandel

Demolition of industrial and retail buildings.

Demolition – Södersjukhuset, Stockholm Demolition
Year
2019
Area
500 m²
Location
Stockholm

Södersjukhuset

Demolition of part of the hospital's main building.

Demolition – KKV, Nacka Demolition
Year
2019
Area
4 800 m²
Location
Nacka

KKV

Demolition of an industrial building.

Demolition – Skärholmen, Stockholm Demolition
Year
2019
Area
2 500 m²
Location
Stockholm

Skärholmen

Demolition of a multi-storey car park.

Demolition – Gjutmästaren, Bromma Demolition
Year
2018
Location
Bromma

Gjutmästaren

Complete demolition of seven buildings in the Gjutmästaren block. Demolition works close to the light-rail line.

Demolition – Kabelverket, Älvsjöstaden Demolition
Year
2018
Area
2 300 m²
Location
Älvsjöstaden

Kabelverket

Demolition of office and hall buildings.

Demolition – Brick, Västberga, Stockholm Demolition
Year
2018
Area
1 600 m²
Location
Västberga, Stockholm

Brick

Demolition of a multi-storey building, offices.